logo
Home > Products > Honeywell Controller >
Honeywell CC-PFB802 51454953-176 FOUNDATION Fieldbus Interface Module

Honeywell CC-PFB802 51454953-176 FOUNDATION Fieldbus Interface Module

Honeywell CC-PFB802

FOUNDATION Fieldbus Interface Module

8 H1 Networks

Brand Name:

Honeywell

Contact Us
Request A Quote
Product Details
Highlight:

Honeywell CC-PFB802

,

FOUNDATION Fieldbus Interface Module

,

8 H1 Networks

Product Description

AMIKON Industrial Supply / Industrial Parts Sourcing, Kept Practical

Honeywell CC-PFB802 51454953-176 FOUNDATION Fieldbus Interface Module

Designed for FOUNDATION Fieldbus H1 integration in Honeywell Experion PKS Series C process control environments, this FIM8 interface supports fieldbus connectivity for industrial process instrumentation. Check the installed hardware arrangement and system revision before ordering a replacement.

Technical Specifications

Product Family Series C
Module Type FOUNDATION Fieldbus Interface Module (FIM8)
Physical Interface H1 FOUNDATION Fieldbus
H1 Network Capacity 8 H1 networks per FIM
H1 Network Rate 31.25 kbps per H1 network
Module Construction Series C module, conformally coated
Module Indicators 24 V power, module status and FTE status LEDs; front display panel provides module and link state information
IOTA Indicators 8 H1 link status LEDs, one per link
Supported Configurations Non-redundant or redundant, side-by-side
Power Dissipation 9.5 W
Module Current 0.380 A at 25 V DC
H1 Link Connection Through connectors on the IOTA

Reference: Honeywell, Experion FOUNDATION Fieldbus Integration Specification, EP03-470-510, Version 1.0, December 2018. Verify revision-specific requirements against the applicable technical documentation.

Application & Failure Scenarios

Used in Experion PKS Series C systems connecting FOUNDATION Fieldbus H1 field instruments to process control.

Loss of H1 communication, abnormal link indications or a suspected interface-module fault may prompt maintenance teams to investigate this module. A prolonged fault can reduce field-device visibility and affect control-loop availability, depending on the affected segment and plant control strategy.

System Compatibility Check

Check the IOTA arrangement, redundancy configuration and installed Experion revision before replacement. Honeywell's October 2024 System HINTS newsletter lists a technical notification concerning FIM8 hardware compatibility with Experion PKS. Confirm the applicable requirements for the installed system before commissioning.

AMIKON Industrial Parts Sourcing

AMIKON industrial parts sourcing and customer support

Industrial Supply · Responsive Support

Miya Zheng

AMIKON Industrial Supply

sales@amikon.cn
WhatsApp: +86 180 2077 6792

Share your part number and application requirements for a sourcing and availability review. Documentation requirements can be included in your enquiry.

Delivery & Warranty

Inspection: Part-number and visual checks; functional testing where applicable and available.

Packaging: Protective packaging selected for shipment.

Warranty: 12 months, subject to confirmed order terms and warranty conditions. Eligible product faults are reviewed; misuse, incorrect installation and unauthorized modification are excluded.

Returns / DOA: Report suspected DOA promptly with the order reference and supporting evidence. Return authorization and the applicable resolution are confirmed after review.

Request a Quote (RFQ)

Please provide the following details:

Part Number · Quantity · Destination · Required Date · Machine/System Model

Email sales@amikon.cn to submit your enquiry.

Frequently Asked Questions

1. How many H1 networks are supported?
The FIM8 specification lists 8 H1 networks per interface module, each operating at 31.25 kbps.
2. Is redundant operation supported?
Yes. The specification lists non-redundant and redundant side-by-side configurations. The installed IOTA and system design must support the intended arrangement.
3. Where are the H1 fieldbus connections made?
The H1 links connect through the connectors on the IOTA. Confirm the matching IOTA and installation requirements before fitting the module.
4. What should be checked if an H1 link becomes abnormal?
Check the relevant IOTA link-status indication and module status, then follow the site's troubleshooting procedure to investigate the affected link, fieldbus segment and interface hardware.
5. What must be confirmed before replacing the installed unit?
Confirm the part number, IOTA arrangement, redundancy setup and Experion revision. Review Honeywell's applicable FIM8 compatibility notification before installation or commissioning.

Related Models

Browse additional industrial automation, control and instrumentation components.

Send your inquiry directly to us