logo
Home > Products > ABB PLC >
ABB Bailey NTAO02 Termination Unit

ABB Bailey NTAO02 Termination Unit

ABB Bailey NTAO02 termination unit

ABB PLC termination module

NTAO02 termination unit with warranty

Brand Name:

ABB

Model Number:

NTAO02

Contact Us
Request A Quote
Product Details
Manufacturer:
ABB / Bailey
Highlight:

ABB Bailey NTAO02 termination unit

,

ABB PLC termination module

,

NTAO02 termination unit with warranty

Product Description

NTAO02 · ABB / Bailey

Installed-base maintenance spare

ABB Bailey NTAO02 Termination Unit

ABB Bailey NTAO02 termination unit for planned spares, outage recovery and maintenance replacement.

TypeTermination unit
SystemABB Bailey control system
FocusMaintenance replacement
BrandABB / Bailey
01

Overview

Product Introduction

ABB Bailey NTAO02 is a termination unit supplied for maintenance of installed industrial control equipment. It is typically requested for planned spares, outage recovery and like-for-like replacement where an existing NTAO02 has been identified in the cabinet.

Before purchase, compare the complete part number, board or assembly revision, connector layout and mating cable with the installed unit. Nameplate and connection photographs help confirm the required supply scope before dispatch.

02

Verified manufacturer data

Technical Specifications

Manufacturer ABB / Bailey
Part number NTAO02
Product type Termination unit
Supply application Installed-base maintenance and like-for-like replacement
Identification check Part number, suffix, board or assembly revision and connector layout
Installation reference Existing cabinet wiring diagram, BOM and site maintenance procedure
03

Maintenance context

Applications & Fault Scenarios

Planned spare coverage

A site keeps a matching NTAO02 available for scheduled maintenance or critical-spares planning.

Outage recovery

The installed termination assembly is damaged or no longer serviceable and the affected cabinet cannot be returned to operation.

Connector or terminal damage

Loose, oxidized or physically damaged connections cause intermittent field signals and repeated maintenance callouts.

Revision mismatch

The model number matches, but the available spare has a different suffix, connector population or board revision that must be checked before fitting.

04

Field practice

Replacement & Installation Checklist

Record the installed unit

Capture the full label, suffix and revision. Photograph the terminal markings, connectors and cable destinations before disconnecting the assembly.

Control the wiring change

Label each conductor and cable, retain shielding and grounding details, and use the approved cabinet drawing as the wiring reference.

Inspect before fitting

Compare connector positions, terminal layout, board revision and physical condition with the removed unit before energizing the cabinet.

Complete the handback

Follow site isolation and commissioning procedures, then verify the affected field circuits and cabinet status before returning the equipment to service.

05

Source record

Official Documentation

Manufacturer Document Document no. / version Link
ABB ABB Ability™ Symphony® Plus Product Catalog 2VAA005340 en G Open document
06

Order support

Amikon Service

Test scope and unit condition are confirmed before dispatch, with ESD-safe export packing. DOA, returns, warranty and after-sales support follow the quotation.

07

Product-specific answers

FAQ

What is ABB Bailey NTAO02 used for?

It is a termination unit supplied for maintenance of installed industrial control equipment, including planned-spare and outage-recovery requirements.

What should be matched before replacing NTAO02?

Compare the complete part number, suffix, board or assembly revision, connector layout, mating cable and the relevant cabinet drawing.

How should NTAO02 wiring be handled during replacement?

Label every conductor and cable before removal, preserve shielding and grounding details, and reconnect only to the approved site drawing.

How should NTAO02 be checked before installation?

Inspect the label, revision, connector positions, terminal layout and physical condition against the removed unit before the cabinet is energized.

Can NTAO02 be supplied while this page has no product image?

Yes. Identification is handled during quotation, and photographs of the exact offered unit can be confirmed when available.

What details are required for an NTAO02 quotation?

Send the Part Number, Quantity, Destination, Required Date and Machine/System Model. Nameplate and connection photographs are helpful.

Request a quotation

NTAO02 RFQ

For an accurate offer and revision check, send the following five details. Add nameplate photographs and connected-module information when available.

Email the RFQ
  • Part Number
  • Quantity
  • Destination
  • Required Date
  • Machine/System Model

Send your inquiry directly to us