logo
Home > Products > GE Mark VIe Controller >
GE IS200TTURH1B Mark VI Turbine Terminal Board for Speed Pickup, Shaft Monitoring & Generator Synchronization

GE IS200TTURH1B Mark VI Turbine Terminal Board for Speed Pickup, Shaft Monitoring & Generator Synchronization

Mark VI Turbine Control

TTUR Terminal Board

IS200TTURH1B pdf

Place of Origin:

USA

Brand Name:

General Electric

Contact Us
Request A Quote
Product Details
MOQ:
1 Piece
Quotation Time:
Quick Quote Within 24 Hours
Freight Collect:
Customer DHL/FedEx Account Supported
Highlight:

Mark VI Turbine Control

,

TTUR Terminal Board

,

IS200TTURH1B pdf

Payment & Shipping Terms
Minimum Order Quantity
1
Packaging Details
Brand new and original
Delivery Time
2-3 work days
Payment Terms
T/T
Supply Ability
in stock
Product Description
AMIKON Industrial Supply / Turbine Control

IS200TTURH1B

GE Mark VI Turbine Terminal Board

A turbine termination board used in the Mark VI control architecture for turbine speed pickup signals, shaft monitoring, generator and bus voltage sensing, and generator-breaker synchronization circuits.

01

Signal Interface & Control Role

How the board fits into the turbine control system

TTUR provides field termination for selected turbine-control signals and connects those circuits with the associated control and protection hardware. Its interfaces include magnetic speed pickups, shaft voltage and current monitoring, generator and bus potential-transformer inputs, and the main generator breaker close circuit.

For automatic synchronization, the generator and bus voltage signals are evaluated alongside turbine speed and synchronization logic. Breaker closure depends on the required internal relay conditions and external permissives; the terminal board alone does not determine whether the generator is ready to connect to the bus.

⌁ Speed pickups Magnetic pulse-rate signal termination
◉ Voltage sensing Generator and bus PT signal connections
↗ Shaft monitoring Shaft voltage and current measurement circuits
⇄ Breaker interface Synchronization permissives and 52G close circuit
02

Technical Specifications

Board identification and system-level interface details

Board reference
IS200TTURH1B

GE Mark VI turbine control architecture

ManufacturerGeneral Electric (GE)
Board designationTTUR turbine termination board
Associated control boardVTUR turbine-control board
Speed pickup interfaces12 passive speed pickup inputs are identified for TTUR in the Mark VI system architecture
Voltage inputsGenerator and bus voltage signals from potential transformers
Shaft inputsOne shaft voltage and one shaft current measurement interface in the documented TTUR configuration
Breaker circuitMain generator breaker 52G close interface with synchronization relay circuitry
Detailed signal, terminal and relay characteristics
Passive magnetic pickup range

The Mark VI system guide gives a pulse-rate range of 2 Hz to 14 kHz and an input sensitivity of 27 mV peak for the documented MPU interface.

Speed signal accuracy

The system-level specification lists 0.05% of reading for MPU pulse-rate accuracy. Confirm applicability to the installed hardware and signal path before using this value for acceptance testing.

Generator and bus voltage

The synchronization interface uses potential-transformer secondary signals. The documented typical nominal value is 115 V AC RMS; verify the actual plant circuit and approved wiring before testing.

Breaker coil circuit

The documented TTUR breaker interface uses a nominal 125 V DC breaker-coil supply. Verify the installed breaker circuit rating, wiring and isolation arrangements before maintenance.

Terminal block layout reference

Terminal range Signal or circuit Identification notes
TB points 1–8 Generator breaker close circuit and associated relay contacts Includes the breaker interface and synchronization relay paths.
TB points 17–20 Generator and bus voltage signals Used by the synchronization interface.
TB points 21–24 Shaft voltage and shaft current signals Confirm the exact terminal assignment against the applicable wiring diagram.
TB points 25–48 Magnetic speed pickup signal pairs Signal pairs are allocated to the documented T, S and R paths.
Configuration note: The terminal mapping and electrical values above describe the documented Mark VI TTUR architecture. Confirm the exact board revision, terminal block markings and plant-specific drawing before wiring, commissioning or replacement.
Synchronization relay logic and redundancy configuration
K25 — automatic synchronization

Works with the VTUR automatic synchronization function to provide the associated breaker-close relay condition.

K25P — synchronization permissive

Provides a permissive condition tied to the turbine control sequence and application logic.

K25A — synchronization check

Provides a synchronization-check relay function associated with the protection-side logic.

Simplex and TMR

The documented architecture uses jumper-selectable relay driver arrangements for Simplex or TMR applications. The correct jumper positions must match the installed control configuration.

The generator breaker close circuit requires the appropriate relay conditions and external permissives. In TMR configurations, the relevant control paths use redundant controller signals and voting logic. Relay status, breaker feedback and circuit supply should be checked as separate diagnostic points.

03

Application & Fault Investigation

Practical checks for common turbine-control symptoms

SIGNAL PATH

Missing or unstable speed signal

Check the pickup device, cable condition, terminal pair, shield termination and corresponding control diagnostics. Confirm whether the issue affects one channel or multiple redundant paths before attributing the fault to the board.

SYNCHRONIZATION

Generator will not synchronize

Review generator and bus voltage measurements, frequency and phase differences, synchronization permissives, relay feedback and external interlocks. A failed close permissive does not by itself identify a defective TTUR board.

BREAKER CIRCUIT

Generator breaker will not close

Check the specified breaker-coil supply, K25/K25P/K25A relay states, external permissives and 52G feedback according to the approved troubleshooting procedure. Isolate the breaker close circuit before any functional test.

SHAFT MONITORING

Shaft signal abnormality

Inspect the sensor circuit, field wiring and signal termination, then compare the indicated measurement with the system's diagnostic data. Confirm the fault source before replacing hardware.

Operational impact: Unresolved speed-signal, synchronization or breaker-interface faults may delay turbine startup or return to service. Diagnosis should distinguish board faults from field devices, wiring, relay circuits and controller logic.
04

Documentation Reference

For technical verification and maintenance planning

The GE Mark VI Control System Guide, GEH-6421 series, covers the TTUR terminal board architecture, speed pickup inputs, synchronization relays, terminal connections and breaker-interface checks. Use the applicable volume and revision together with the plant's approved wiring diagrams to verify the installed configuration.

Search phrase: IS200TTURH1B manual PDF

05

Supply, Inspection & Warranty

Confirm the supplied item's condition before dispatch

Item verification

Part number, available condition information and the quoted supply scope are checked against the order details.

Inspection and packaging

Available inspection or testing and protective packaging arrangements are confirmed for the specific quoted item.

DOA and returns

Report suspected arrival damage or a dead-on-arrival issue promptly with supporting photos and order details. Return authorization is required.

Warranty

Warranty duration, coverage, exclusions and return conditions are governed by the written quotation and agreed terms.

AMIKON Industrial Supply

Connecting You with the Parts You Need

Share the part number, equipment details and required condition to coordinate identification, quotation and shipment arrangements.

AMIKON industrial parts sourcing and service team
Industrial automation parts inspection and order preparation
Industrial Parts Sourcing Inspection · Order Coordination
Contact Sales

Need a quotation for IS200TTURH1B?

Send the full part number and your destination details. Include a photo of the board label when available to help confirm identification.

06

Frequently Asked Questions

Key points for identification and replacement

Which signals are terminated through the TTUR board?
The documented Mark VI TTUR architecture includes passive magnetic speed pickups, shaft voltage and current measurements, generator and bus potential-transformer inputs, and the generator breaker close interface.
How does TTUR participate in generator synchronization?
It provides the generator and bus voltage terminations and the relay interface associated with synchronization permissives and breaker closure. The complete sequence also depends on controller logic, the relevant control boards and external permissives.
What should be checked if the generator breaker will not close?
Review the breaker-coil supply, synchronization relay states, voltage and frequency conditions, external interlocks and breaker feedback using the approved plant procedure. A failed close command alone is not sufficient to identify the faulty component.
Can a different TTUR hardware revision be installed directly?
Do not assume direct interchangeability. Confirm the full part number, revision, connectors, jumper arrangement, system architecture and approved replacement documentation before installation.
What details help confirm the correct replacement?
Provide the complete board label, installed system or machine model, quantity, required condition and destination. Clear photos of the board marking and connector arrangement can support identification.
07

Related Models

Additional industrial automation and drive references

View related models
AMIKON Industrial Supply

Send your inquiry directly to us